Heavy! The third "Wuyue Square" in Huzhou opened today, so don’t miss many promotional activities!

This morning (October 29th), Zhili Wuyue Plaza was grandly opened. This is the third "Wuyue Square" in Huzhou after the opening of Wuyue Square in Nanxun, which is a new landmark of Zhili business! It has attracted the attention and expectation of citizens in Zhili.

Zhili Wuyue Plaza Complex Project is located at the intersection of Zhili, Xing Wu Avenue and Axiang Road, a new town in the east of Huzhou, with a total construction area of about 700,000 ㎡. Its business covers self-sustaining shopping centers, star-rated hotels, theme pedestrian streets and high-end residences (Yijingfu).

Among them, Zhili Wuyue Plaza Shopping Center consists of indoor shopping center and outdoor commercial street, with a total construction area of about 90,000 ㎡. There are 6 floors in indoor shopping, which are divided into 1 floor underground and 5 floors above ground. There are 172 brands in the shopping mall, of which 146 are the first brands to enter Zhili.

Zhili Wuyue Plaza has gathered well-known brand restaurants, children’s theme blocks, local children’s wear brand flagship stores, international sports trend brand image stores, leisure and entertainment stadiums, etc., and introduced the formats of Times Studios, theme parent-child parks, large-scale fresh supermarkets, etc., which will create a one-stop international SHOPPING MALL of "eating, drinking, shopping and entertainment", presenting a 360-degree family immersive consumption experience and becoming the first leading commercial body of the East New Town.

During the opening of Wuyue Plaza in Zhili, a series of shopping mall promotion activities were prepared, and interested citizens can go and participate.

China’s movies have been marketized for 20 years, and domestic animation is not limited to Nezha!


Special feature of 1905 film network Looking at domestic animated films,

"Bears haunt" series and "White Snake" series and many other ingenious works.

A banner with unique oriental characteristics was erected.

Looking back on the 20-year process of film marketization in China,

The beautiful scenery of domestic animated films,

Always occupy an important position.

From the middle and late 1990s to the beginning of this century,

When foreign animated films flood into China.

On the other hand, China’s animation industry is difficult to make a breakthrough and fall into a downturn.

Until it was released nationwide in 1999,

And made 25 million at the box office,

It opened the door to the revival of domestic animated films.

Lotus Lantern was an animated film with the highest investment and the longest length in China at that time.

The role is dubbed by powerful actors such as,,,, and so on.

At the same time, the film also introduced computer special effects technology.

To some extent, it has inspired the development trend of domestic animated films.

After entering the new century,

Support policies for domestic original animation have been introduced one after another.

By establishing a national animation industry research base,

Exempt from relevant enterprise income tax,

Require TV stations to increase animation broadcast time, set up animation columns,

And measures such as setting up animation specialty in major colleges and universities.

Actively support domestic animation industry.

In 2005,

Created a precedent for three-dimensional animation in China,

Although the market is not satisfactory,

But it began to cultivate top CG production talents in China.

In recent years, Ne Zha’s Return of the Great Sage on the Journey to the West

It is the outbreak of this group of 3D animated film practitioners who have been dormant for nearly 20 years.

In the seven or eight years since 2005,

A series of works such as Pleasant Goat and Big Big Wolf, Bears Come and Go.

Have cultivated the audience base through cartoons.

Since 2009,

"Pleasant Goat" released a big movie in the Spring Festival for seven consecutive years.

"Bullshit" became the first domestic animated film with a box office of over 100 million.

And won the 13th China Film Watch Award for Excellent Cartoon.

Since 2014,

"Bears haunt" has been launched continuously in the Spring Festival.

Xiong Bing, Fantasy Space, Primitive Times, Returning to the Mainland, etc.

The cumulative box office of eight big movies exceeded 4.2 billion yuan.

Become the best-performing series of animated films in the market.

In 2015,

The Return of the Great Sage of Journey to the West, which took 8 years to polish and produce.

Won the box office champion of domestic animated films with a box office of nearly 1 billion.

It has become a new "turning point" of Guoman industry.

The classic stories that are deeply rooted in people’s hearts cooperate with the 3D special effects that are popular all over the world.

Coupled with the martial arts design with oriental charm,

This film makes domestic animation get rid of the stereotype of younger age.

Gradually face a more aging population.

Then,

wait for

Guoman boutiques have emerged one after another.

In 2019,

Ne Zha scored 5.035 billion at the box office.

Refreshed the set in 2016.

The box office record of animated films in China mainland market is the highest,

And ranks fourth in the box office of China Film History.

Become a milestone in the creation of domestic animated films.

The film is bold and innovative on the basis of classics.

Tell a familiar, fresh, passionate and touching "China Story".

Deconstruction that keeps pace with the times, realistic scenes, exquisite CG quality,

Audio-visual enjoyment brought by high-end digital technology and smart character expressions,

Hold up a declaration of "My life is up to me" for domestic animation.

Throughout 2015,

Six of the annual box office winners of animated films in China are domestic films.

Among them, "The Return of the Great Sage of Journey to the West" Ne Zha.

Legend of Deification’s White Snake 2: The Green Snake Robbed.

All four novels belong to myths and legends.

It contains distinctive oriental characteristics.

IP with domestic characteristics

It is very popular in China film market.

By combing the phenomenal animated films in recent years, we can find that,

Their audience presents

The trend of "parent-child viewing as the basic disk and young audience as the increment".

This year’s bold "attack" on science fiction themes,

In addition to funny family fun, it also incorporates elements such as aliens and high technology.

It has achieved progress in the content and form of domestic young cartoons.

Therefore, it attracted a group of adult audiences.

At present, "Big Fish Begonia 2" and so on

Many exciting domestic animated films are being made.

I believe that in the near future,

Domestic animated films will surely find their own way out.

Become a magic weapon to help China to become a film power.

Chen Kaige defendant! Do you believe that The Legend of the Demon Cat will be plagiarized?

Chen Kaige

1.6 billion yen!


This is a good box office result of the film in Japan, and it has become the most popular Chinese film in Japan in the past ten years.


This should be a gratifying event, which proves that China’s film art has been recognized overseas. However, the subsequent development surprised people: The Legend of the Demon Cat soon became the focus of the topic again, but unfortunately it was negative — — The film was accused of plagiarism.

       Coincidentally, such a thing happened in the past few months. The big winner at the Oscar ceremony was similarly "plagiarized and touched porcelain". Moreover, the time point of this incident is similar to that of The Legend of the Demon Cat, which is the time when the exposure of the two films is extremely high — — The appearance of Water Story is on the eve of the award.


       

       The same incident happened a few years ago. James Cameron suffered "plagiarism" because his film sold a magic box office of $2.7 billion and the claim amount was outrageous. What is even more outrageous is that this work was sued by four people for plagiarism.


       

       I want to express my highest "respect" to these "masters" who dare to stand up and safeguard the rights and interests of their works, because there is no room for sand in their eyes.


       For example, our Mr. Shi Jiaofeng, in order to protect his intellectual property rights, didn’t see the explanation when the Legend of the Demon Cat was publicized. This work was adapted from the Japanese magic series novel "The Ghost Banquet of the Tang Dynasty in the Empty Sea". I’m sorry I’m just a little ignorant here, but how can I copy it when people say adaptation?


       Mr. Shi Jiaofeng should not seek the rights protection from The Legend of the Demon Cat, but should seek the rights protection from Baku Yumemakura, the author of The Ghost Banquet of the Tang Dynasty. After all, only in this way can the disease be cured, and the root cause can be found once and for all on the road of safeguarding rights, which will deal a fatal blow to these "plagiarists".


       As a predecessor of safeguarding rights, Zhou Shaomou gave us "evidence" that we admire. Apart from the cliches about people and scenes, Mr. Zhou Shaomou said that the aliens in Avatar are the most naked plagiarism, because the aliens in Avatar are exactly the same as those in his novels, and the prototype of aliens in the novels comes from his own face.



       Only then did I know: words can really come true after several times, and someone is really imitating my face.



       This not only "infringes" Mr. Zhou Shaomou’s copyright, but also "infringes" his portrait right, demanding compensation of 1 billion yuan, which is to safeguard the dignity of his own works and personality.


       After being accused of plagiarism, Water Story still claims compensation. Therefore, from all these "farce" and arguments, what I see is the more serious disrespect for intellectual property rights and works of art hidden behind the incident.


      We can find common ground from these three things.



       "The Legend of the Demon Cat" used 250 million yuan to create a feast of bliss, which was not recognized by many audiences. The domestic box office performance of 530 million yuan can only be said to be average. Before and during the film’s release, no one pointed out that the film had any plagiarism. It happened that when The Legend of the Demon Cat performed well at the box office in Japan, there was a so-called plagiarism.



       When Water Story was first released in Venice, there was no problem of plagiarism. This extremely serious negative news appeared when "Tale of Water" was trying to hit the Oscar with all its strength. Director Toro was also extremely indignant at the time: "The purpose of this incident is obvious."



       "Avatar" was accompanied by a big box office sale, and received three court summons within 10 days. James Cameron prepared a 45-page statement to prove the innocence of his work.



       The root of these "touching porcelain" incidents is that these works have great commercial benefits to be tapped. These people want to "find another way" to share a piece of cake, take advantage of it, and at worst, attract people’s attention and make themselves a hot spot. This "buffoon" behavior reflects an extremely unhealthy industrial phenomenon.


       Although "The Legend of the Demon Cat" has not been finalized, and "Tale of Water" has not been overshadowed by this incident at the award ceremony, such behavior is a disrespect for the creator himself and a pernicious corrosion of the original soil.


       Why did these three films encounter "touching porcelain"? By comparison, we will find the reason.



       The Legend of the Demon Cat, The Story of Water and Avatar are not films with particularly complicated stories. Their artistic attainments are more about the construction of the world outlook and the profound core in their works.


        It is precisely this that gives the "chicken thief" a chance. Take the Story of Water as an example, its story is very common, and it is not uncommon to rescue other civilized creatures as human experimental objects in commercial films.



       This setting is not exclusive. I also watched the 12-minute short film "The Space Between Us", and its sense of story form is similar to that of "Water Story". The whole film is more like the story at the end of "Water Story".



        However, the film "The Space Between Us" itself is much thinner than the deep philosophical core of "The Story of Water". It’s like two people have a similar idea at the same time, but the quality of the works presented is quite different.



       These three works are basically of this type, and the "chicken stealers" only dare to make a fuss about this type of film, because they are too complicated to challenge the script.



       More and more people go into cinemas and choose movies whose themes can attract them. But after all, not everyone is very familiar with film production and the crew itself. Therefore, when some movies are "plagiarized and touched by porcelain", ordinary viewers can’t judge the truth behind the incident for the first time. They will be misled at the first time, which will greatly hurt the producers of the film and make their hard-working works be wronged.



        Here, I appeal to the fans. If something like this happens to your favorite or disliked movies, don’t follow the trend for the first time, but learn more and think more. Specifically:


       We hope that the Legend of the Demon Cat can get a fair judgment, and we also hope that such "plagiarism touching porcelain" incidents will become less and less. After all, good film works are not copied, but the painstaking efforts of the film production team. Of course, a thousand readers have a thousand Hamlets. Do you think these three works have been copied?


Can new plant varieties also apply for "patents"? Remember to give it a cool official name!

Ziyun, a New Yulan Variety

  A New Magnolia Cultivar Zichen

  Bingxing, a new species of Rosa

  What is the right to new plant varieties?

  The right to new plant varieties refers to the exclusive right to use the varieties authorized by the units or individuals who have completed breeding, which belongs to the category of intellectual property rights. A new plant variety refers to a new plant variety that has been cultivated artificially or developed from the discovered wild plants, and has novelty, specificity, consistency and stability, and has an appropriate name.

  The ultimate goal of protecting the right of new plant varieties is to encourage more organizations and individuals to invest in the field of plant breeding, which is conducive to breeding and popularizing more new plant varieties, promoting the construction of seed engineering in China and promoting the continuous development of agricultural and forestry production.

  How to apply for new plant varieties?

  The acceptance, examination and authorization of the application for new plant varieties shall be the responsibility of the Office for the Protection of New Plant Varieties of the State Forestry and Grassland Bureau. The application follows the principle of first come, first served. After the new variety discoverer submits the information such as words and pictures, relevant experts will go to the site for observation. When the test results pass the expert review and remain stable within the specified time, the application may be passed.

  Princess, Green Feather, Love, Lingnan Yuanbao, Tan 07413, Ice Star, Caiyun Perfume No.1, Ms. Rococo, lovely ice cream, excellent, red and black … …

  What do you think of after reading the above phrases? In fact, they are all plant names!

  In September this year, the State Forestry and Grassland Bureau announced the list of the first batch of "new plant variety rights" granted in 2019, including the above-mentioned 214 new plant variety rights.

  Is the new plant variety right a new plant species? Will the value of authorized new plant varieties rise? A few days ago, a reporter from Chengdu Business Daily-Red Star walked into the Science and Technology Department of Sichuan Forestry and Grassland Bureau to reveal this "plant patent".

  one

  The process is similar to patent application.

  By the National Forestry and Grassland Bureau of new plant varieties protection office.

  "Previous names may be more derived from the special shapes or colors of plants." The relevant staff of the Science and Technology Department of Sichuan Forestry and Grassland Bureau said that it is similar to the powder cloud, purple rhyme and purple Chen identified this time. In addition, adding numbers to words is also one of the common ways, such as Rejia No.13, Rejia No.14 and Rejia No.17 identified this time.

  With the opening of people’s minds, more and more personalized names appear on the list of "authorized new plant varieties", such as cute ice cream, handsome guy tie, Yunxiangrong and so on. The staff said that in principle, as long as there is no duplication with the existing name, the discoverer can name it according to his own wishes without violating the relevant requirements.

  Naming sounds a bit capricious, but it is not easy to get authorization if you want to apply for approval. The staff pointed to the application date column on the list and said that the growth cycle of various plants is different, so the time from the beginning of application to the final approval is different. Among the new variety rights passed this time, the earliest application date is December 1, 2012, and the latest application date is August 29, 2018.

  "The application process is similar to applying for a patent." The staff explained that the acceptance, examination and authorization of applications for new plant varieties are the responsibility of the Plant New Variety Protection Office of the State Forestry and Grassland Bureau. The application follows the principle of first come, first served. After the new variety discoverer submits the information such as words and pictures, relevant experts will go to the site for observation. When the test results pass the expert review and remain stable within the specified time, the application may be passed.

  2

  The right to new varieties is not equal to the discovery of new varieties.

  It may be a wild mutation, or it may come from artificial culture.

  "Authorization of new plant varieties does not mean the discovery of new species." The staff said that taking the new variety named "Wang Fei" as an example, its genus (species) is Rosa, and Rosa includes rose, rose and Qilixiang. "Princess" may be a rose with unique new characteristics, such as color or flower shape. But it is only a new variety of roses, not a new species.

  The characteristics that it shows, which are different from other roses, may come from artificial culture, or it may be that wild roses in nature have mutated. "So the new variety right we are talking about now is more based on the discoveries of botanists in the past." The staff said that it is basically difficult to find new species of plants now, and most of them have been discovered and named by predecessors.

  Discovering new plant species will help people deepen their understanding of nature. What is the significance of discovering or artificially cultivating new plant species? The staff said that in fact, everyone has been doing this for a long time, just like the merchants in the market take different names for different roses. They are for commercial purposes, and the official began to grant the right to new plant varieties when China joined the WTO.

  "At first, foreign flower companies proposed that new plant varieties also need authorization protection similar to the copyright of books and audio-visual products." The staff said that foreign companies can also apply for the right to new varieties in China. In the list published this year, there are companies from the Netherlands, Denmark, Germany and other countries. The reason is simple, that is, new plant varieties also have patent rights and are protected by law. However, this kind of patent right is not as easy to realize as the copyright of books and audio-visual products at present because of some characteristics of plants themselves.

  three

  Eight authorized new varieties in Sichuan.

  The right to new varieties in the future may determine the lifeline of the industry

  "The applicants this time can be roughly divided into two categories." The staff said that one is a commercial company in the flower and seedling industry, and the other is a flower and seedling research institute. Commercial companies are naturally driven by interests, and the prices of authorized new varieties will definitely increase, and more importantly, they will be protected by law. And research institutions are more focused on the future patent reserves. Just like many technology companies, they have applied for many patents at present, which can not be realized for the time being and can not be applied to actual production. But no one knows whether these patents will become important key technologies in the future. Up to now, there are 8 new varieties of forestry plants authorized by the state in Sichuan, which are still in their infancy.

  "Regionality is an important limiting factor." The staff said that the same new plant variety planted in different places may have different results, which has a great impact on the commercial promotion of new varieties. Most people don’t want to take risks with great value, preferring local mature varieties. At the same time, the introduction of new varieties may also cause the invasion of alien species. Therefore, the right to new plant varieties and the copyright of books and audio-visual products are very different in actual operation.

  "The right to new plant varieties contains the wisdom and sweat of the discoverer", and the plant copyright seems to be a blue ocean with reefs. In the future, some new variety rights may become the "chip" of flower and seedling industry and determine the lifeline of the industry. Chengdu Business Daily-Red Star Journalist Lin Cong Ye Yan

Beijing Municipal Commission of Housing and Urban-Rural Development, Beijing Municipal Planning and Natural Resources Commission, Beijing Civil Air Defense Office, Beijing Municipal Bureau of Market S

Jing Jian Fa [2020] No.10

All relevant units:

  In order to further deepen the "streamline administration, delegate power, strengthen regulation and improve services" reform, continuously optimize the business environment in the capital, and promote the reform and innovation of joint acceptance of housing construction and municipal infrastructure projects, according to the implementation opinions on comprehensively carrying out the reform of the examination and approval system for engineering construction projects (Guo Ban Fa [2019] No.11), Regulations on Optimizing the Business Environment, Regulations on Urban and Rural Planning in Beijing, Regulations on Optimizing the Business Environment in Beijing and other requirements, the Municipal Housing and Urban-Rural Construction Committee and other ten departments It is issued to you, please follow it carefully.

Beijing Municipal Commission of Housing and Urban-Rural Development    

Beijing Municipal Commission of Planning and Natural Resources    

Beijing Municipal Civil Air Defense Office    

Beijing Municipal Market Supervision Administration    

beijing municipal water affairs bureau    

Beijing Archives Bureau    

Beijing Municipal Commission of Communications    

Beijing Municipal Administration Committee    

Beijing Communications Administration Bureau    

Beijing Municipal Government Affairs Service Management Bureau    

November 18, 2020  

Interim Measures of Beijing Municipality on the Administration of Joint Acceptance of Housing Construction and Municipal Infrastructure Project Completion

Chapter I General Provisions

  the first In order to further optimize the business environment, deepen the joint inspection and acceptance reform of housing construction and municipal infrastructure projects, and implement the Implementation Opinions on Comprehensively Carrying out the Reform of the Examination and Approval System for Construction Projects (Guo Ban Fa [2019] No.11), Regulations on Optimizing the Business Environment, Regulations on Urban and Rural Planning in Beijing and Regulations on Optimizing the Business Environment in Beijing, these Measures are formulated in light of the actual situation of this Municipality.

  the second These Measures shall apply to the joint acceptance (hereinafter referred to as joint acceptance) of the completion of new construction, renovation and expansion of housing construction projects (including decoration projects) and municipal infrastructure projects (excluding rail transit projects, underground pipeline projects, power projects and security projects) within the administrative area of this Municipality.

  Joint acceptance shall be implemented according to the comprehensive risk grade of the project. The comprehensive risk of the project is divided into four levels: low risk, general risk, large risk and major risk. In principle, joint acceptance should be implemented for low-risk and general-risk engineering projects; For engineering projects with higher risk level, joint acceptance is encouraged on the basis that the project has mature acceptance conditions and the risk is controllable; Joint acceptance is not recommended for engineering projects with significant risk levels. See the annex for the comprehensive risk level of the project.

  Article The term "joint acceptance" as mentioned in these Measures refers to the application of the project construction unit, the streamlining and optimization of the competent departments of housing and urban construction, planning of natural resources, civil air defense, market supervision, water affairs, archives, transportation, urban management, communications, etc., and the collaborative promotion of administrative matters related to the project completion acceptance, urging and coordinating municipal service enterprises to actively provide municipal public services such as water supply, drainage, power supply, gas, heat and communication, standardize, efficiently and conveniently complete the project acceptance, and promote.

  Article 4 Joint acceptance follows the working principle of "standardization, cooperation, sharing, high efficiency and convenience" and realizes the working objectives of "one application form, one notification, one commitment, multi-inspection, unified opinion and time limit completion". There is no charge for joint acceptance.

  Article 5 The municipal (district) housing and urban-rural construction department shall, in accordance with the Regulations of Beijing Municipality on Urban and Rural Planning, co-ordinate and organize the joint acceptance of the city (district), use the special seal for joint acceptance of the city (district) construction project, summarize the opinions of relevant competent departments and issue joint acceptance opinions. If other acceptance items are applied for joint acceptance, they shall be implemented after being approved by the municipal government.

  Article 6 The competent department of housing and urban-rural construction is responsible for the overall organization and coordination of joint acceptance work, as well as the supervision of project completion acceptance, fire inspection and acceptance, and the audit of real estate surveying and mapping results.

  The competent department of planning and natural resources is responsible for the planning and acceptance of construction projects and the acceptance of urban construction archives.

  The competent department of civil air defense is responsible for the supervision of the completion and acceptance of civil air defense projects.

  The market supervision department is responsible for the registration of the use of special equipment for construction projects.

  The water department is responsible for supervising, coordinating and guiding municipal service enterprises such as water supply and drainage to provide municipal public services.

  The urban management department is responsible for supervising, coordinating and guiding municipal service enterprises such as gas, heat and power supply to provide municipal public services.

  The archives administration department is responsible for supervising and guiding the archives acceptance of major construction projects invested by the government in fixed assets.

  The transportation department is responsible for guiding the acceptance of supporting parking facilities.

  The competent department of communications is responsible for supervising, coordinating and guiding municipal service enterprises such as communications to provide municipal public services.

  The municipal service enterprise is responsible for the access, connectivity and operation services of supporting municipal public facilities such as water supply, drainage, power supply, gas, heat and communication within the service scope of the enterprise.

  Article 7 Relying on the online approval and supervision platform for investment projects in Beijing (hereinafter referred to as the online platform), the city has established a unified service platform for joint acceptance of construction projects in Beijing (hereinafter referred to as the platform of multi-inspection), strengthened the sharing and exchange of relevant data and information of information platforms of various competent departments and municipal service enterprises, supported cross-departmental business collaboration, and promoted the seamless connection of the whole process of joint acceptance.

  The competent department of housing and urban construction is responsible for the construction, management and maintenance of the multi-test platform.

  Article 8 Joint acceptance shall be subject to comprehensive notification and commitment system. The competent department of housing and urban-rural construction shall integrate the contents to be informed and promised by the competent departments, formulate a comprehensive notification commitment letter, inform the specific construction requirements, acceptance application materials, acceptance process and acceptance standards of the project at one time, and clarify the contents that the construction unit needs to promise.

  When applying for joint acceptance, the construction unit shall promise in written form (including electronic text) that the construction task has been completed in accordance with the requirements, and meet the conditions, standards and requirements of the comprehensive notification undertaking, and bear the corresponding responsibilities for violating the commitment. The comprehensive notification undertaking shall be signed by the legal representative of the construction unit or its authorized person and stamped with the official seal of the construction unit.

  Article 9 All competent departments and municipal service enterprises shall strengthen information sharing, timely grasp the progress and situation of project construction, provide services in advance and take the initiative, effectively strengthen the whole process management of joint acceptance, and share regulatory data with relevant competent departments.

Chapter II Strengthening Quality and Safety Supervision of Construction Projects

  Article 10 The quality and safety of construction projects in this city should be managed differently according to the comprehensive risk level of the project.

  Before the project starts, the construction unit shall specify the comprehensive risk level of the project, and share the comprehensive risk level of the project with the competent departments through the online platform. In the process of engineering construction, the construction unit, survey unit, design unit, construction unit and supervision unit should establish and improve the risk control system and mechanism, formulate the working system, define the responsible subject, comprehensively and systematically identify the quality and safety risks in all stages and links of engineering construction, and take measures to effectively control risks to ensure the quality and safety of construction projects.

  The construction unit, construction unit and supervision unit shall regularly inspect the quality and safety risks at all stages and links of the project, evaluate the risk management and control, and report the inspection and evaluation results to the risk management and control platform established by this Municipality.

  Article 11 In the process of engineering construction, the competent department of housing and urban-rural construction will carry out quality and safety supervision and inspection. For low-risk projects, the first work disclosure meeting will be cancelled, and only one on-site supervision and inspection will be carried out during the construction process, and the longest time will not exceed one day; For general risk projects, the frequency of supervision and spot check shall be no less than once every 3 months; For projects with large risks, major risks and poor risk management and control, the frequency of supervision and spot checks shall be increased as appropriate according to the progress of the project.

  If the participating units of the project fail to implement risk classification control, quality and safety accidents occur or promises are not fulfilled, the competent department of housing and urban construction will increase the number of random inspections and strengthen post-event supervision.

  Article 12 Establish a joint inspection system. The relevant competent departments may put forward the intention of joint inspection to the competent department of housing and urban-rural construction, and the competent department of housing and urban-rural construction shall organize joint inspection. After the joint inspection, the competent departments shall form written inspection records respectively, and disclose the inspection results to the public voluntarily.

Chapter III Joint Acceptance Procedures

  Article 13 Before the construction unit handles the planning permission, after the multi-planning collaborative platform completes the project planning consultation, it will push the comprehensive notification commitment letter to the construction unit together with the multi-planning collaborative opinion of the project. The construction unit can log on to the multi-regulation collaborative platform or online platform to download the format text of the comprehensive notification commitment letter.

  Article 14 After the comprehensive review of the construction drawings is passed, the multi-examination platform of the competent department of planning and natural resources will push the digital documents of the construction drawings to the relevant competent departments, and simultaneously push the multi-examination platform through the online platform. According to the construction drawing documents, the relevant competent departments shall provide active services in advance for the relevant administrative matters of their own departments.

  Article 15 The construction unit may put forward the joint acceptance intention according to the comprehensive risk level of the project when handling the construction permit procedures; After the completion of the project, the construction unit can decide whether to implement joint acceptance according to the comprehensive risk level of the project.

  The implementation of joint acceptance of the project, the construction unit shall organize the project completion acceptance or self-examination after all qualified, submit an application for joint acceptance within 5 working days. For projects that do not implement joint acceptance, the construction unit shall organize the project completion acceptance in accordance with relevant regulations, and the relevant competent departments shall independently implement the acceptance according to law.

  Article 16 The construction unit shall complete the construction task, confirm that the project quality conforms to the relevant laws and regulations, mandatory standards for project construction, design documents and contract requirements, organize the contractors to complete the project completion acceptance or self-inspection, and submit the project completion acceptance report (comprehensive). The project completion acceptance report (comprehensive) mainly includes the following contents (except the acceptance items not involved):

  (a) the completion and acceptance of the project (including the fire inspection of the project);

  (two) the completion and acceptance of civil air defense projects (including the payment of ex situ construction fees for air defense basements);

  (three) the implementation of planning permission matters;

  (four) the completion and acceptance of water supply, drainage, power supply, gas, heat and communication projects (hereinafter referred to as small municipal projects);

  (five) the completion and acceptance of parking facilities;

  (six) the collection, sorting and self-examination of engineering archives.

  Article 17 The construction unit can fill in the application form for joint acceptance through the online platform, select the acceptance items involved in the project, upload the comprehensive notification letter of commitment, project completion acceptance report (comprehensive), completion drawings and other materials, submit the application for joint acceptance, or hold relevant materials to the municipal and district government service centers for on-site application.

  Article 18 After the construction unit submits the joint acceptance application through the online platform, the online platform accepts the joint acceptance application, and transmits the application information and application materials involved in the project to the multi-inspection platform in real time.

  Article 19 Within 15 days from the date of acceptance of the application for joint acceptance, the competent department of housing and urban construction shall organize the relevant competent departments to complete the on-site acceptance and issue acceptance opinions. The specific time of on-site acceptance shall be determined by the competent department of housing and urban-rural construction and the construction unit through consultation, and the competent department participating in on-site acceptance shall be fed back through the platform of multi-inspection.

  At the site acceptance, low-risk projects should be completed within 1 day; General risk projects should be completed within 3 days; Major risk and major risk projects should be completed within 7 days.

  Article 20 If all the acceptance opinions are "passed", the joint acceptance is passed. The multi-inspection platform generates a notice of joint acceptance opinions, and the construction unit can download and print it by itself through the online platform. Any acceptance opinion is "no pass", and the joint acceptance is no pass. The multi-inspection platform generates a notice of joint acceptance failure, and the municipal (district) housing and urban-rural construction department takes direct delivery to feedback the construction unit.

  City (District) housing and urban construction departments in the joint acceptance notice stamped with the city (District) special seal for joint acceptance of construction projects, as a unified confirmation document through joint acceptance. The electronic seal for joint acceptance is implemented in this Municipality. The electronic seal and the special seal for objects have the same legal effect, and the notice of joint acceptance with electronic seal is legal and valid.

  Article 21 For projects that fail to pass the joint acceptance, the relevant competent authorities shall order the illegal acts found to be corrected, and inform the construction unit of the matters that need to be rectified at one time. If the construction unit can complete the rectification within 7 days, it may apply for on-site review after the rectification. After on-site review, still does not meet the requirements, the construction unit shall re-organize the relevant acceptance of the project completion, and re-apply for joint acceptance or independent implementation of the acceptance. The rectification and review time is not included in the 15-day period.

  Article 22 Projects subject to joint acceptance can only be delivered after passing the joint acceptance. The joint acceptance notice replaces the project completion acceptance record form, and the joint acceptance is deemed as the completion of the project completion acceptance record.

  The warranty period of the construction unit for the project quality of the construction unit shall be calculated from the date when the construction unit organizes the relevant acceptance of the project completion. The warranty period of the construction unit for the project quality of the owner shall be calculated from the date of delivery.

Chapter IV Main Contents of Joint Acceptance

  Article 23 The competent departments of housing and urban-rural construction and civil air defense shall, in accordance with their duties, conduct on-site inspection on the completion acceptance of the project (including the fire inspection of the project) and the completion acceptance of the civil air defense project, including supervising whether the organizational form, acceptance procedures and implementation acceptance standards of the project completion acceptance meet the relevant regulations, conducting spot checks on the filing materials of the project completion acceptance, conducting fire inspection on special construction projects or conducting spot checks on other construction projects’ fire inspection records, respectively, to form the quality supervision report, fire inspection or filing spot check records of the project (civil air defense project).

  Article 24 If the competent department of planning and natural resources determines to participate in the on-site acceptance, it shall conduct spot checks on the implementation of planning permission matters and the self-inspection of project completion files; Do not participate in on-site acceptance, should be issued within the prescribed time limit planning acceptance opinions and file acceptance opinions.

  Article 25 After the testing organization completes the supervision and inspection of special equipment installation, it will push the basic information and inspection related information of special equipment to the market supervision and management department. Special equipment users will no longer fill in the basic information and inspection information of special equipment when registering the use of special equipment.

  After the registration of the use of special equipment is completed, if the market supervision and management department decides to participate in the on-site inspection, it shall verify whether the number and nameplate of special equipment are consistent with the registration form of the use of special equipment; Do not participate in on-site acceptance, should be issued within the prescribed time limit for special equipment acceptance opinions.

  Article 26 City (District) Department in charge of transportation (parking management department) to participate in on-site acceptance, to deal with the acceptance of parking facilities construction units to conduct spot checks; Do not participate in on-site acceptance, should be issued within the prescribed time limit parking facilities acceptance opinions.

  Article 27 The water department shall cancel the on-site acceptance of supporting water-saving facilities, and implement the notification commitment system for the completion acceptance of supporting water-saving facilities of construction projects.

  Article 28 Optimize the audit scope of real estate surveying and mapping results. The comprehensive surveying and mapping work involved in the completion acceptance can be undertaken by the construction unit to choose a surveying and mapping unit or consortium that meets the requirements. Need to synchronize for real estate surveying and mapping results audit of engineering projects, submitted to the audit of real estate surveying and mapping results should be used as the basic data content of relevant acceptance items, housing and urban construction departments will no longer review the licensing content or technical indicators involved in relevant acceptance items.

  Article 29 Integrate the file acceptance of major construction projects and urban construction file acceptance matters. For the joint acceptance of major construction projects involving government investment in fixed assets, the competent department of planning and natural resources shall notify the archives administration department to implement the file acceptance together, and the competent department of planning and natural resources shall clarify the file acceptance opinions.

  Article 30 In the process of engineering construction, relevant technical indicators need to be approved in accordance with technical standards and specifications through inspection, testing, surveying and mapping, etc., mainly including planning verification, fire control facilities testing, supervision and inspection of special equipment, etc., and the construction unit shall timely entrust an institution with corresponding qualifications to complete the technical approval work in accordance with regulations.

Chapter V Municipal Public Services

  Article 31 When the construction unit applies for planning permission, it can fill in the municipal access service demand in the planning permission application form. Municipal service enterprises carry out proactive services in advance, and provide services such as implementation plan consultation, design drawing consultation and site reconnaissance.

  Article 32 After the construction unit obtains the planning permit, the municipal service enterprise will actively provide municipal access services according to the demand for municipal access services pushed synchronously, guide and assist the construction unit to complete the construction and acceptance of small municipal projects, and ensure that the municipal access and connectivity conditions are met.

  Article 33 After the construction unit completes the construction of the small municipal project, the municipal service enterprise shall complete the connection of water supply, drainage, power supply and other supporting municipal public facilities before the construction unit organizes the project completion acceptance or self-inspection; Within 15 working days after the completion of the project, the supporting municipal public facilities such as gas, heat and communication will be connected.

  Article 34 After the joint acceptance of the project, the municipal service enterprise shall provide timely operation services. For residential projects, municipal service enterprises should provide users with water supply, drainage, power supply, gas, heat and communication services in time to ensure the normal use of users.

Chapter VI Strengthening Post-event Supervision in Joint Acceptance.

  Article 35 The competent departments shall, according to their respective functions and duties, strengthen the supervision of the joint acceptance work, and investigate and deal with the illegal acts of contractors and relevant personnel in violation of existing laws, regulations, standards and norms.

  Article 36 All competent departments should strengthen credit supervision, conduct spot checks on the commitments made by the construction unit, and order the construction unit to make rectification within a time limit, and increase the inspection proportion and frequency of its projects under construction and new construction; If the circumstances are serious, joint punishment for dishonesty shall be implemented in terms of qualifications, bidding, finance and credit.

  Article 37 The city adopts the method of government purchasing services, and entrusts third-party institutions to regularly evaluate the joint acceptance work and user satisfaction.

  Article 38 The city has established a joint inspection and acceptance assessment mechanism, and the assessment results have been included in the scope of the city’s performance appraisal.

  Article 39 Promote the disclosure of joint acceptance information. After the joint acceptance of the project is passed, the competent department of housing and urban-rural construction shall take the initiative to disclose the joint acceptance opinions of the project. Before the project is delivered for use, the construction unit shall voluntarily disclose the relevant information of joint acceptance of the project and accept social supervision.

  Article 40 The construction unit shall be responsible for the quality of the construction project according to law. Relevant competent departments shall bear corresponding legal responsibilities for their acceptance opinions. Citizens, legal persons or other organizations that the specific acceptance opinions infringe upon their legitimate rights and interests may apply for administrative reconsideration to the competent department at the next higher level or the people’s government at the same level that issued the specific acceptance opinions, and may bring a lawsuit to the people’s court if they are not satisfied with the administrative reconsideration decision; You can also bring a lawsuit directly to the people’s court.

Chapter VII Supplementary Provisions

  Article 41 The competent departments may formulate relevant implementation measures or detailed rules in accordance with these measures.

  Article 42 These Measures shall come into force as of December 30, 2020, and the Interim Measures for Joint Acceptance of Social Investment Construction Projects in Beijing (J.J.F. [2018] No.118) and the Implementation Rules for Joint Acceptance of Construction Projects in Beijing (for Trial Implementation) (J.J.F. [2018] No.481) shall be abolished at the same time.

  Attachment: Comprehensive Risk Classification Table of Engineering Projects (omitted)

  (Note: Please visit the website of the Municipal Housing and Urban-Rural Development Committee for the attachment.)

Analysis of Five Highlights in the Release of Twelve Citizens: "Rich Second Generation Killing"

    1905 movie network news The high-profile crime suspense film was released nationwide on May 15th. The film won the highest prize of Rome International Film Festival, the jury prize of Beijing University Student Film Festival and other domestic and international awards in succession. Two rounds of movies in China have been acclaimed by the industry and abroad, and the number of people who want to see it on well-known ticketing websites such as Cat’s Eye and Guevara is even catching up with Reunion 2, which indicates that this high-quality film will set off a nationwide "watch the best domestic film of the year in advance" viewing craze.

Aspect 1: The strongest word of mouth in May is known as "locking the best domestic film of the year in advance"

    Twelve Citizens, a crime suspense masterpiece, was released nationwide. At the previous premiere of the film, Xu Xiaoping, Zhang Jiajia, Huang Xi and many other celebrities in and outside the industry jointly recommended the film. The famous director Huatao Teng said: "Twelve Citizens is a domestic film that everyone must see this year!" Zhang Jiajia, a famous writer, voiced for the film: "This film has completely achieved an extreme, … … The story is wonderful from beginning to end, and everyone’s psychological process and their own past events are displayed. " Pan Caifu, a famous writer, was very excited after watching the film, and wrote that night: "The first half of the year is not over yet, but the best domestic film of the year has been born. I am convinced of this. " Yan Peng, a famous film critic, praised director Xu Ang’s handling of conflicts and lines in movies and dramas at a cross-border movie viewing salon, which can give "a lesson to most domestic directors". He also thought that Twelve Citizens should be among the best in the domestic film rankings in 2015. "Any annual Chinese film list without this film is untrustworthy!"

    Xu Xiaoping, a famous film producer who invested in this film, said: "Nowadays, there are too many films that rely on fans to get the box office, but there are too few films like Twelve Citizens that rely on acting and stories to impress people, and that reflect the society. Twelve Citizens is commendable." He said that from "Twelve Citizens" to "Twelve Citizens", he insisted on investing in movies that were both desirable and good-looking.

    In addition to the praise of celebrities, in the previous film activities, "Twelve Citizens" was widely affirmed by audiences from all over the world. As a remake, "Twelve Citizens" is as wonderful as the original, but the localized plot is more grounded and sharp, and the plot without urine and breathing won the applause after the screening. After watching the screening, a college student posted a film review titled "Mom no longer has to worry that I will be frightened when I see domestic films", and the release of Twelve Citizens was also regarded by the industry as a battle for the dignity of domestic films in the first half of the year.

Aspect 2: China’s version of "12 Angry Men" has a sharp acting line and "speaks off the charts"

    "Twelve Citizens" was performed by twelve national treasures, such as He Bing and Han Tongsheng. Twelve national treasures from He Bing and Han Tongsheng, both from the People’s Arts and Mandarin, competed on the same stage to show the audience what "acting school" means. The 12 leading actors played the roles of doctors, real estate agents, security guards, professors, insurance salesmen and so on from different social strata. Everyone’s scenes were allocated reasonably, and they all excelled at the same time.

    Twelve "angry men" who "angry" for justice did their best to graft the tension of drama into the film perfectly in a narrow closed space, and interpreted the secret room debate of Twelve Citizens as the carefree feeling of martial arts masters’ confrontation. Every "angry man" tells his own unknown past, and the "father as a child and gentleman as a minister" frequently recited by juror No.3 seems to contain sad things at home; Juror No.5 was called a "capitalist" by others, and after a run, it finally erupted like a volcano. "You are hating the rich!" Accusing his college girlfriend, he shouted, "When you see a good girl get off a good car, you call her a rich man. You are jealous! That is an insult to outstanding young women in China! " , the core figure played by He Bing — — Juror No.8 is even more forceful. "No one can judge a person guilty unless the evidence is conclusive." In the face of Han Tongsheng’s ferocious provocation and accusing him of "nitpicking", he held back his anger and asked, "Should a person be shot? Should this be nitpicking?" Sharp lines can be found everywhere in movies, and the screening sometimes attracts the audience to burst into laughter and clap their hands. 

Aspect 3: "Century Court Play" was born to stage the ultimate trial for the truth.

    The background of the film is very pleasing. The jury system is added to a mock trial, and a "court drama of the century" in which 12 people from different classes debate under the same roof is performed. In the depiction of the courtroom drama, the wonderful story of the film is not only perfectly inherited, but also strengthens the reasoning and suspense in the tense confrontation of the courtroom drama. In the tense multi-person confrontation, the story is gradually stripped. "Is the rich second generation killing his father?" Is it guilty or not? Is the evidence conclusive? The truth gradually surfaced, and the process has been exciting. As He Bing said, in the process of pursuing the truth, the bigger enemy we face is "prejudice". How to fight against inner prejudice to pursue the truth and save a life has become the biggest suspense of the film.

Aspect 4: The murder of the rich second generation, the suspense of city by the sea’s crime, brewing "flat thunder"

    "Twelve Citizens" tells the story of a "rich second generation" patricide case that happened in contemporary China. Because it is full of controversy and doubts, it has aroused strong public concern. In an experimental virtual court, a "Chinese jury" emerged, and 12 ordinary people who had nothing to do with each other and represented all walks of life got together. After listening to the trial in the student court, they discussed the case in an unprecedented way and made a final "judgment" on the case … … The film revolves around a suspenseful case of patricide of the rich second generation. From eleven people finding the rich second generation guilty to the final truth, all eleven people defected and found him innocent. In the middle, the layers of fog, such as suspicious witness testimony and unclear pointing of murder tools, were cleared away one by one. The audience could not help but be brought into the tense process of uncovering the truth in the film, as if they were the 13th juror on the scene, sharing joys and sorrows with the film’s leading actors.

Aspect 5: Adapted from Hollywood classic IP story localization is more grounded and more edgy.

    Twelve Citizens is adapted from 12 Angry Men, a classic in film history. The original version has long been regarded as a masterpiece in the hearts of fans. As the first adaptation of the China version, Twelve Citizens has achieved a perfect tribute to the original through the affirmation of many domestic and foreign awards. Director Xu Ang ingeniously transplanted the western jury system into the current social soil of China, which made the misunderstanding of fairness, justice and prejudice have a chemical reaction in China society and created a meaningful contemporary "Chinese prophecy". Shooting 12 Angry Men in a country without a jury system, Xu Ang, a director who is good at classic localization, has accomplished an almost "impossible task" and created a fascinating crime suspense masterpiece for the audience, which is suitable for the 80′ s and 90′ s youth.

Take you to know the advantages and disadvantages of Dongfeng Nissan Sylphy.

How about Nissan? Let me show you the advantages and disadvantages of Dongfeng Nissan.

Anyone who knows Nissan’s classics knows that it is a compact car, so what are its cost performance, advantages and disadvantages? Next, let’s study with me. In terms of appearance, the classic appearance is quite atmospheric and especially popular. The whole model is relatively young and fashionable. The most striking thing is the front, and the edges and corners are relatively clear. The design of headlights looks particularly sharp. The daytime running lights are really good. The low beam is led, and the high beam is a little dissatisfied. This is just an ordinary light bulb. Its tail is particularly round and has a strong night resolution.

daily output

In terms of power and fuel consumption, the engine displacement is 1.6 liters, which matches the transmission CVT. This combination is suitable for family cars. Violent driving is not allowed. Power is not allowed. I want to drive on weekdays. Unless the car is crowded with people, the power is enough. Personally, I think driving is still very competitive in the same level of models. The acceleration of gearbox is not as good as that of automatic gearbox.

engine

Space and comfort: the space is really big. In terms of space and comfort, people sitting in the back row will feel that there is a lot of space in the back row and its storage space can meet everyone’s daily needs. The interior is made of a large area of soft material. Its central control and door panels are very satisfactory at this price, which is better than many cars of the same type. Classic and Nissan sofa cooperate, and the comfort is better than the same car, which can realize the ideal driving experience for everyone.

seat

Its sound insulation and noise reduction function is also excellent. You don’t have to talk loudly in the car. Everyone in the car can hear you. The feeling of driving at high speed will be more obvious. You will know that its chassis is thick and flexible, and its noise control is better than that of the same type of Nissan. Sometimes it even makes you feel that it is not like Nissan.

daily output

In terms of handling, the stability of the steering wheel is very important. The stability of classic steering wheel is very good. The direction is accurate. The steering wheel is very light and easy to use. This is very beneficial to people who drive for a long time. Although the handling is not very good, it will not be too disappointing.

steering wheel

The most dissatisfied thing is that the central control design is too plastic, which makes people feel unsafe. Except for the screen, the central control is a bit low. Besides, the new car smells a little heavy. It reminds families with children that they must always be bathed in storms at an early stage. It may take a year for this smell to dissipate slowly. Classic car paint may be a little thin, and there will be scratches on the harder branches. However, although it doesn’t have many bright spots, it’s not as ugly as annoying at first sight, right? Actually, this is good, too. The price is reasonable, the configuration is practical and the space is large.

In the control

Generally speaking, the classic is very cost-effective. It has low fuel consumption, especially fuel economy, and large internal space. The internal configuration of central control can be used in daily life. There is a lot of space in the trunk. The dynamic performance is also very good. Full of people, it is not difficult to speed up. If you only want to own a car, Classic is the best choice, because its purchase cost and maintenance cost are very low, and the space can meet the needs of the elderly and children. Even if you replace it after driving for a few years, its preservation rate will surprise you.

Starting from the center of gravity, test drive Changan Xinyi 1.6L5mt.

  [Original test drive] In today’s era of rapid consumption, one second is still a hot topic, and perhaps no one cares about the next second; The new words in people’s mOuths today will be said two days later. Maybe you will be labeled as "out". If you want to keep up with the rhythm, you have to constantly update the iteration. This truth is applicable to all walks of life. As a result, every year at the auto show, we can hear the news that "the number of first-time models has reached a record high", but compared with blindly expanding the product line, I appreciate the practice of constantly improving the quality of a car, so when I see this new almost unchanged appearance, I look forward to experiencing those "invisible and intangible" improvements.

Home of the car

● Appearance change is not the point.

  At the briefing before the test drive, the factory staff said that in the investigation of the current car owners, we found that everyone was quite satisfied with the appearance of Yidong, so this time, the new car retained the appearance of the current model, only making adjustments in some details.

Changan Automobile Yidong 2016 1.6L GDI manual sharp type

Changan Automobile Yidong 2016 1.6L GDI manual sharp type

Changan Automobile Yidong 2016 1.6L GDI manual sharp type

  If the license plate with the words "new Yidong" is not hung, I think there are very few people who can recognize this new model except the owner of the cash Yidong. Looking for differences from the appearance of the car is a bit like playing the game "Let’s find fault". The headlights may be the biggest change in the front face. The addition of new lights can only be said to keep up with the times at present, while the black underskirt and the new exhaust pipe shape are all changes in the rear.

Changan Automobile Yidong 2016 1.6L GDI manual sharp type

Changan Automobile Yidong 2016 1.6L GDI manual sharp type

Changan Automobile Yidong 2016 1.6L GDI manual sharp type

  The change of the side is that the shape of the door handle has become the same as that of the escape XT, and the position has been moved up to the waistline of the car body, so the overall feeling of the car side has been improved compared with the current one, and the style of the five-spoke rim is no longer fresh, which is available on the current model.

Changan Automobile Yidong 2016 XT 1.6L GDI manual sharp cool type

Changan Automobile Yidong 2016 XT 1.6L GDI manual sharp cool type

Changan Automobile Yidong 2016 XT 1.6L GDI manual sharp cool type

Changan Automobile Yidong 2016 XT 1.6L GDI manual sharp cool type

  In appearance, the new escape XT changes from some details to a younger direction. Whether the front air intake grille changes well or not is a matter of opinion, and the diffuser-like design of the tail part and the rear enclosure is believed to be favored by many young people.

Speeding up the construction of a modern industrial system supported by the real economy —— The second review of implementing the spirit of Politburo meeting of the Chinese Communist Party and doing a

  Xinhua News Agency, Beijing, May 1st Title: Accelerate the construction of a modern industrial system supported by the real economy — — The second series of comments on implementing Politburo meeting of the Chinese Communist Party spirit and doing a good job in current economic work

  Xinhua News Agency reporters Dai Xiaohe, Ye Haoming and Gao Kang

  The the Political Bureau of the Communist Party of China (CPC) Central Committee meeting held on April 28th proposed that "we should speed up the construction of a modern industrial system supported by the real economy" and "we should consolidate the foundation of self-reliance and self-reliance in science and technology and cultivate new kinetic energy".

  The real economy is the foundation of a country’s economy. Whether dealing with current risk challenges or accumulating lasting kinetic energy, we need to firmly grasp the key of the real economy. We must persist in putting the focus of economic development on the real economy, promote new industrialization, promote the upgrading of industrial base and the modernization of industrial chain, and improve economic quality and efficiency and core competitiveness.

  Put the focus of economic development on the real economy

  In all the arrangements made by Politburo meeting of the Chinese Communist Party this time, "to speed up the construction of a modern industrial system supported by the real economy" occupies an important position.

  "Building a modern industrial system is an inevitable requirement to promote high-quality development, an urgent need to win the initiative of big countries, and an important task to build a socialist modern country in an all-round way." Cai Zhibing, an associate professor in the Department of Economics Teaching and Research of the Central Party School (National School of Administration), said that the real economy is the "foundation" of the modern industrial system and the "ballast stone" of a country’s economy. It is very important to deal with the difficult challenges faced by the current economic operation and make it stronger and better.

  The country’s competitiveness depends on the real economy. Report to the 20th CPC National Congress of the Party emphasized that "the focus of economic development should be on the real economy".

  Consolidate the foundation and cultivate the yuan. Advanced manufacturing is a key to the real economy, and economic development cannot be divorced from reality at any time. In recent years, China has continuously tackled key core technologies and weak parts around key manufacturing industrial chains. Upgrade traditional industries and vigorously promote technological transformation and equipment renewal; Focus on strengthening advantageous industries and consolidate and enhance the advantages of the whole industrial chain; Focus on cultivating and expanding emerging industries, and constantly enrich and expand new application scenarios.

  The data shows that in the first quarter of this year, the added value of industrial enterprises above designated size in China increased by 3% year-on-year, and generally stabilized and rebounded. Among the 41 industrial categories, 23 industries maintained growth year-on-year.

  Guo Liyan, director of the Comprehensive Situation Research Office of China Macroeconomic Research Institute, said that only when the real economy is stable can the foundation of economic development be more solid. At present, China still has more policy space to stabilize the operation of the real economy. It is necessary to speed up the construction of a modern industrial system and effectively guarantee high-quality development.

  Tamp the foundation of scientific and technological self-reliance and cultivate new kinetic energy

  The meeting pointed out that it is necessary to consolidate the foundation of self-reliance and self-improvement of science and technology and cultivate new kinetic energy.

  Innovation is the source of power to promote the high-quality development of the real economy. Promoting the deep integration of scientific and technological innovation and the real economy is not only a "just need" based on current development, but also a long-term plan to plan the future.

  To consolidate the foundation of self-reliance and self-reliance in science and technology, it is necessary to further increase key core technologies.

  In the first quarter of this year, investment in equipment manufacturing industry and high-tech service industry increased by 17% and 17.8% respectively, which strongly boosted the development of high-tech industries.

  According to the spirit of Politburo meeting of the Chinese Communist Party, all localities and industries should adhere to innovation-driven development, focus on key manufacturing industrial chains, identify key core technologies and weak links of spare parts, concentrate high-quality resources to tackle key problems together, and ensure that the industrial system is autonomous, controllable, safe and reliable, and ensure the smooth circulation of the national economy.

  To consolidate the foundation of self-reliance and self-improvement of science and technology, we must enhance the resilience of the supply chain of the industrial chain.

  Domestic extracorporeal membrane oxygenation (ECMO) products were approved for marketing; The construction of eight national computing hub nodes of the "East Counting and West Computing" project started; The new energy automobile industry is accelerating its development towards electrification and intelligence … … A number of key areas of industrial chain research have reached a new level, and the resilience of China’s industrial chain supply chain has been further improved.

  Consolidating the foundation of self-reliance and self-improvement of science and technology is the premise of cultivating and expanding new kinetic energy.

  "We should make innovation a driving force for development, vigorously promote the close integration of scientific and technological innovation with the real economy, and constantly increase the proportion and contribution rate of scientific and technological innovation in the real economy." Chen Xiaodong, deputy director of China Industrial and Enterprise Competitiveness Research Center of China Academy of Social Sciences, said that it is necessary to give play to the leading role of major science and technology projects, so that basic research and applied research can promote each other, and support the healthy and stable development of China’s real economy with continuous independent innovation in science and technology.

  Accelerate the breakthrough in the short-board field and become bigger and stronger in the advantageous field.

  Building a modern industrial system plays an important role in building a new development pattern and promoting high-quality development.

  The meeting put forward a clear direction for accelerating the construction of a modern industrial system supported by the real economy: "It is necessary to go against the trend, speed up breakthroughs in short-board areas, and take advantage of the trend to become bigger and stronger in advantageous areas", "to consolidate and expand the development advantages of new energy vehicles" and "to attach importance to the development of general artificial intelligence, create an innovative ecology, and pay attention to preventing risks".

  Forging the long board and making up the short board go hand in hand, so as to enhance the independent controllability of the supply chain of the industrial chain, better prevent economic risks, promote the high-quality leap of the industrial system, and promote economic development to improve quality and efficiency.

  The just-concluded Shanghai Auto Show showed the vitality and charm of China’s auto industry: it received more than 900,000 visitors at home and abroad; There are 93 starting cars in the world, including 65 China brands, accounting for about 70%; A total of 271 new energy vehicles were exhibited, and 186 China brands also accounted for nearly 70%.

  Building the world’s largest and technologically advanced network infrastructure, emerging technologies such as artificial intelligence, cloud computing, big data, blockchain and quantum information rank first in the world, and the digital economy ranks second in the world … … The construction of digital China is profoundly affecting all aspects of economic and social life.

  Feng Wenmeng, a researcher at the State Council Development Research Center, said that in recent years, technologies such as Internet, big data and artificial intelligence have been increasingly applied to traditional industries such as manufacturing and energy. It is necessary to expand and consolidate development advantages and deeply integrate digital technology with the real economy.

  "Forging the long board" improves the overall efficiency of development, and "filling the short board" solves the problem of "sticking the neck". To stabilize the real economy, we must not only consolidate the leading position of advantageous industries and cultivate new growth engines, but also continue to exert our strength in "blocking points" and "blocking points".

  "At present, China’s digital economy and the real economy are accelerating integration, and manufacturing investment and infrastructure investment continue to exert their strength. We must take advantage of the situation and persist in making the real economy stronger and better as the main direction, so as to lay a solid foundation for promoting the continuous improvement of economic operation and achieving high-quality development." Guo Liyan said.

Six pure electric vehicles with a range of 200-300 km were unveiled.

    How far can your car run?
 
    The first season of the electric state "PaPa" competition has been successfully concluded, which allows the majority of car owners to know the longest cruising range of their cars, but also has many experiences that have never been seen before, and deepens their understanding of their cars. The first season of the competition received enthusiastic response, and other car owners hoped that we could hold a race with a cruising range of 200-300 kilometers. In order to fully meet everyone’s needs, on March 25th, we started the second season of the "PaPa PaPa" competition — A Tale of Two Cities in Beijing and Tianjin.
    Let’s talk about the rules of the game to friends who don’t know: this is not the kind of "bang bang" you think in your mind, but a challenge to the cruising range of electric vehicles. Test how much the real cruising range of electric vehicles is until you drive to the armpit; Car owners don’t have to worry about the troubles after sleeping, because we have prepared a variety of rescue measures to wait for you to sleep.

    In this competition, we will have a thrilling 300-kilometer endurance PK in the future, including urban areas, loops, highways and all kinds of real road conditions. Who will last longer? Who can surpass the endurance limit?
The scoring rules have also been adjusted, taking the proportion of cruising range beyond the Ministry of Industry and Information Technology of this vehicle as the judging standard. The greater the proportion of cruising range, the higher the score and the greater the prize. The first prize is a 50-inch full HD LED LCD TV, and who will spend the TV? Let’s wait and see!

    The total length of the competition route is about 230 kilometers. First, it starts from the electric state headquarters of Jingshi Lawyer Building in the East Fourth Ring Road, enters the Beijing-Tianjin-Tanggu Expressway from the Fourth Ring Road, and the midpoint is the Eye of Tianjin Ferris Wheel. On the return journey, it enters Yizhuang Development Zone along the Beijing-Tianjin Expressway, and finally gathers and sprints near the second canal subway station.

    There are 6 models participating in this competition, namely Geely Emgrand EV 2016, BYD e5, BYD Qin EV300, BAIC EU260, Changan Yidong EV and Tengshi 300.

1. Geely Emgrand EV 2016
     The cruising range of the Ministry of Industry and Information Technology is 253km
     Battery capacity is 45.3kWh.

2. BYD e5
    The cruising range of MIIT is 305km.
    Battery capacity is 43kWh.

3. BYD Qin EV300
    The cruising range of the Ministry of Industry and Information Technology is 300km
    The battery capacity is 47.5kWh

4. Beiqi EU260
     The cruising range of MIIT is 260km.
     The battery capacity is 41.4kWh

5. Changan Yidong EV
     The cruising range of the Ministry of Industry and Information Technology is 200km
     Battery capacity 30kWh

6. Tengshi 300
     The cruising range of the Ministry of Industry and Information Technology is 253km
     The battery capacity is 47.5kWh

    Before the start of the competition, there are still staff to explain the competition route and various precautions for everyone, so that everyone participating in the competition can know fairly well.

    Before the start of the race, the odometer of each car was cleared, because some cars cleared the subtotal mileage when they were at the charging station, and some miles had been driven at the starting point, and another car directly used the total mileage to calculate, but this had no effect on the race results, and the results were all true and valid.

    After starting from Jingshi Lawyer Building, we went straight to Beijing-Tianjin-Tanggu Expressway. The road conditions were very good, all the way was smooth, and there was no traffic jam. The speed was basically kept at a constant speed of 50-70 km/h.

    Not long after entering the expressway, there was a serious traffic jam at the exit to the west of Tianjin, which even affected the passage of the main road, but we don’t know the specific reason for the traffic jam.

    However, the road ahead of us was smooth, and the speed was kept at about 80km/h, heading for Tianjin.

    Later, we arrived at Xuguantun service area to adjust and rest. Here, we also found an unexpected discovery: there is an electric vehicle charging and replacing station in this service area, especially the equipment of the changing station is very commendable, which provides convenience for the more efficient driving of electric vehicles in the future. In an interview with the owner of Beiqi, who is charging, he said: I learned very early that there is a competition in the electric state today, and I am very concerned about it. I will attend it in person if I have the opportunity in the future.
 
    After that, we drove smoothly on this expressway, and all the way was smooth. In this case, driving is still very energy-saving for electric vehicles.

    After driving off the highway, we soon approached the midpoint of the trip — The Eye of Tianjin Ferris wheel, from a distance, stands there with great momentum.

    Although it is the midpoint of this trip, the power consumption of vehicles is basically less than half, so the car owners are very happy to take photos with Tianjin landmark buildings as a souvenir.

    At this time, it was close to 12 noon, and we went to the "Eight Bowls" restaurant next to the Food Street in Nanshi, Tianjin, which is also a famous time-honored brand in Tianjin, where we are about to start a unique steamed stuffed bun eating competition.

    The rule of the competition is that the one who gets the most steamed buns in his mouth at the same time wins, provided that the steamed buns can’t be exposed outside his mouth, and the winner will get a mysterious prize from our electric state. Because some of the pictures of the competition are too "ferocious", we won’t show them to you, so everyone can make up the intense scenes when eating steamed buns by themselves.

    The result of the competition surprised everyone in the venue. The winner turned out to be the oldest uncle, who won the mysterious prize Durex box. After the game, everyone clinked glasses to congratulate him, hoping that he could use this grand prize happily.

    After dinner, we started heading for Beijing, passing through tianjin drum tower along the way, and the building as a whole is very characteristic of China.

    Walking in the urban area of Tianjin, Zotye E200 and some low-speed electric vehicles can be seen from time to time, which also shows that electric vehicles have developed rapidly in large cities, which is a good sign. However, the appearance of this kind of low-speed scooter similar to the elderly on urban roads exposes some problems. First, there are many doubts about the legality of this kind of vehicle on the road, and secondly, it is safe. This kind of vehicle is not low in speed. If it is driven with a motor vehicle, it will be fatal to the people inside.

    Soon we will enter the Beijing-Tianjin Expressway, which is a two-way eight-lane design. Compared with the Beijing-Tianjin-Tangshan Expressway, the road conditions are much better and the road conditions are excellent. Here, our car owners are very cool, and some car owners also turn on cruise control, which can save both labor and electricity.
Just as we are about to reach the end of this competition — In Yizhuang Development Zone, the first crouching vehicle appeared. The final score of Changan Yidong EV was 211.7km, which exceeded the cruising range of the Ministry of Industry and Information Technology by 11.7km, and finally exceeded the value of the Ministry of Industry and Information Technology by 5.85%.

    When Yidong EV is about to lie prone, a staff member will lead the way out of the expressway to avoid danger. After sleeping, we dispatched a rescue vehicle to drag Yidong EV to the gathering charging station of Hung Yue Building in Yizhuang Development Zone for charging. The charging station inquired through the e-charging network APP, looked at nearby sites on the homepage, found the nearest idle charging pile through dynamic information, and then used the mobile phone to scan the code to charge.

    After the code scanning is successful, the charging pile starts quickly. During the whole charging process, the charging progress can be monitored through the APP, and the time and power consumption of the vehicle can be queried. The overall use process is very convenient and the overall experience is very good.

    E-charging network is a public service management platform for charging facilities under the guidance of Beijing Municipal Government. At present, it has been connected to most operators in Beijing, as a connector between users, governments and operators, which has broken the previous isolation of charging information and realized the interconnection between charging facilities and service platforms.

    Using an APP can connect a variety of charging piles, easily solve the charging problem, and effectively alleviate the charging anxiety of new and old users. This interconnection can be used as a model for the interconnection of national charging infrastructure, which will promote the development of China’s new energy automobile industry to a certain extent.

    At this moment, the other five cars are still driving in Yizhuang Development Zone. We have designed a circular route with a length of about 5km. There are few social vehicles and the road conditions are very smooth. Everyone can rest assured to drive. Here, we have also prepared a "about charging" fast charging car. Just when everyone has no electricity, we can simply understand this car as a "large charging treasure". Once the vehicle has no electricity, it can be quickly charged.

    A diesel generator is installed in this truck to directly extract fuel from the fuel tank of the vehicle to generate electricity, but this does not change from dispersed pollution to concentrated pollution. A purifier is equipped in the truck to turn waste gas into steam, which can maximize environmental protection. There will be no noisy noise coming out when the generator is working, and the sound can be as low as 60 decibels. First, we use BYD e5 work car for charging experience, and almost no noise can be heard during the actual charging process, which is still good.

    Car owners can make a variety of APPointments and make on-site charging through the mobile APP, and then there will be staff to provide services, and finally the settlement payment through the app is very convenient.

    Because this road is very good and there are few social vehicles, everyone’s speed is not fast and the brakes are rarely used, and the speed is controlled entirely by the throttle, so the race has been going on for a long time. Although there is a certain gap between the last race and the actual road driving, there will be no such perfect road conditions in the actual driving, but it can also be regarded as a reference value.
After driving for a period of time, the second vehicle appeared. Beiqi EU260 traveled 276.5km, exceeding the cruising range of the Ministry of Industry and Information Technology by 16.5km, and finally exceeding the value of the Ministry of Industry and Information Technology by 6.35%.

    The third crouching vehicle appeared, and the Geely Emgrand EV 2016 traveled a total of 324.7km (because it was the same as Tengshi’s mileage, it was calculated by 325km), which exceeded the cruising range of the Ministry of Industry and Information Technology by 72km and finally exceeded the value of the Ministry of Industry and Information Technology by 28.46%.

    The mileage of the fourth Pawo car Tengshi is actually the same as that of Emgrand EV, which is 325km, which exceeds the cruising range of the Ministry of Industry and Information Technology by 72km, and finally exceeds the value of the Ministry of Industry and Information Technology by 28.46%. Because Tengshi didn’t clear the subtotal mileage at the starting point, it used the total mileage to calculate, and the total mileage can only be accurate to single digits, so the Emgrand EV mileage was also calculated to single digits. Although it seems a little imprecise, it is all after the decimal point and will not affect the result of the race, so the results of the two cars are the same.

    The fifth pawo car is BYD Qin EV300, with a total distance of 323.4km, which exceeds the cruising range of the Ministry of Industry and Information Technology by 23.4km, and finally exceeds the value of the Ministry of Industry and Information Technology by 7.80%. You may have questions, how can people with less mileage lie down later than those with longer mileage? Because the driving speed of BYD Qin EV300 is very slow, while the driving speed of other owners is slightly faster, and the number of laps is different, which leads to a long time for BYD Qin EV300.

    The last car was BYD e5, which traveled a total of 373.6km, exceeding the cruising range of the Ministry of Industry and Information Technology by 68.6km, and finally exceeding the value of the Ministry of Industry and Information Technology by 22.49%.

The results of this competition are as follows:
 
Bangpingdian
    This competition still continues the principle of fairness, justice and truthfulness for the first time, and the competition process and results are completely true and effective, but the cruising range of electric vehicles has a great relationship with road conditions, driving methods, driving speed and even weather conditions, and it is impossible to copy the results of this competition blindly; In the final stage of the race, everyone tried their best to get the first place, and the speed was slow, and there was almost no brake action, which made the actual mileage in the end different, but the result of the race was beautiful, and all the vehicles exceeded the cruising range value of the Ministry of Industry and Information Technology, indicating that it is not necessary to pay attention to the mileage deliberately in the actual use process, but to drive according to the mileage calibrated by the manufacturer.